This page describes the general procedures of getting things ready for the field trial on site. Note that some of these can be done in parallel.
Unlock the trailer compartment, slide out the power generator and get that going.
Take the UAV out and plug in the battery packs, so the GPS unit on the UAV can start acquire satellite signals
Set up the antenna: make sure to tape it if placing it on top of the trailer
Set up the Comm Box: plug in power and the serial-to-serial cable
Set up the Remote Control: plug in power and plug it into Comm Box
Set up the control laptop running Phairwell: boot it up, plug in Comm Box, video, external monitor, and start Phairwell
Set up the video receiver: power it and then plug in control laptop and wonderbox
Set up the network hub/switch: plug in power
Set up the Wonderbox Server: plug in everything (power, mouse/keyboard, monitor), and configure network.
Set up the viewer laptops (running WonderClient): plug in power and network cable (and video?)
Set up phairwell:
-
Launch UAV into the air
Fly UAV using Phairwell (might have to turn antenna toward the UAV manually)
Set landing point in Phairwell
Once UAV is on the ground
Back to top